benameji

 

FACTS OF INTEREST:

YEAR: 2010

 

SPECIFICATIONS:

 

LENGHT:

6,58 kms

 

KIND OF WORK:

Double track of UIC wide High-Speed Rail Roadway


(Roadway total wide, 14,00 m).


Maximum speed: 300 km/h


Traffic type: Mixed (Passengers and goods).

 

TUNNELS: 

1 cut and cover tunnel 189,944 m long. Structure of type vault of reinforced concrete rested on brake shoes

and counter vault .

 

STRUCTURES: 

4 Underpasses and 3 Overpasses.

 

2 Viaducts :

 

« Pizarros viaduct »: 782 m long, 17 spans, 48 m maximum span and 10.948,0 m² area.

 

« Valdetravieso viaduct »: 1.614 m long, 34 spans, 48 m maximum span and 22.596,0 m² area.

 

CONTRACT BUDGET: 788.848,71 € (VAT included)

 

ESTIMATED BUDGET TO INVITED TENDERS OF THE WORKS: 77.575.237,20 € (VAT included)

 

PERIOD PROVIDED FOR CONSTRUCTION: 24 months.


CLIENT: SPANISH MINISTRY OF PUBLIC WORKS. Railroads Administration.