TECHNICAL CHARACTERISTICS:
LENGTH: | 13.32 kilometers |
WORK CLASS: | Highway with 8.00 m median and two carriageways of two lanes each Total width of each roadway 12.00 m. Project speed:120 km/h |
LINKS: 3 | “Junction with the MA-206 road”: Typology of diamond with 2 traffic circles. “Junction with the A-92 highway”: Four-quadrant cloverleaf typology. “Junction with the national road N-331”: Diamond type with 1 traffic circle. |
STRUCTURES: | 5 Superior Steps Expansion of 1 bridge |
ESTIMATED TIME FOR EXECUTION OF THE WORKS: 40 months