benameji

 

FACT OS INTEREST

YEAR: 2006

 

SPECIFICATIONS:

 

LENGTH:

5,58 kms.

 

KIND OF WORK:

Double track of UIC wide High-Speed Rail Roadway

 

(Roadway total wide, 14,00 m).

 

Maximum speed: 250 Km/h

 

Traffic type: Mixed (Passengers and goods)

 

TUNNELS: 4

« Uruburu-1 Tunnel»: 474,699 m long; Free cross-sectional area 85 m²

 

« Uruburu-2 Tunnel »: 460,071 m long; Free cross-sectional area 85 m²

 

« Mazmela Tunnel »: 384,299 m long; Free cross-sectional area 85 m²

 

« Induspe Tunnel »: 2.223,983 m long; Free cross-sectional area 85 m²

 

STRUCTURES: 

3 Viaducts:

 

« GI-3343highway viaduct »: 471 m long, 8 spans, 66 m maximum span, pointed arch 132 m span

and 6.594,0 m² area.

 

« Zarimutz viaduct »: 261 m long, 6 spans, 52 m maximum span and 3.654,0 m² area.

 

« Uriarte viaduct »: 282 m long, 7 spans, 52 m maximum span and 10.948,0 m² area

 

CONTRACT BUDGET: 817.988,80 € (VAT included)

 

ESTIMATED BUDGET TO INVITE CONSTRUCTION TENDERS: 113.091.364,94 € (VAT included)

 

PERIOD PROVIDED FOR CONSTRUCTION: 30 months.


CLIENT: SPANISH MINISTRY OF PUBLIC WORKS. Railroads Administration.