FACT OS INTEREST
YEAR: 2006
|
|
SPECIFICATIONS:
|
|
LENGTH: |
5,58 kms.
|
KIND OF WORK: |
Double track of UIC wide High-Speed Rail Roadway
(Roadway total wide, 14,00 m).
Maximum speed: 250 Km/h
Traffic type: Mixed (Passengers and goods)
|
TUNNELS: 4 |
« Uruburu-1 Tunnel»: 474,699 m long; Free cross-sectional area 85 m²
« Uruburu-2 Tunnel »: 460,071 m long; Free cross-sectional area 85 m²
« Mazmela Tunnel »: 384,299 m long; Free cross-sectional area 85 m²
« Induspe Tunnel »: 2.223,983 m long; Free cross-sectional area 85 m²
|
STRUCTURES: |
3 Viaducts:
« GI-3343highway viaduct »: 471 m long, 8 spans, 66 m maximum span, pointed arch 132 m span and 6.594,0 m² area.
« Zarimutz viaduct »: 261 m long, 6 spans, 52 m maximum span and 3.654,0 m² area.
« Uriarte viaduct »: 282 m long, 7 spans, 52 m maximum span and 10.948,0 m² area
|
CONTRACT BUDGET: 817.988,80 € (VAT included)
|
|
ESTIMATED BUDGET TO INVITE CONSTRUCTION TENDERS: 113.091.364,94 € (VAT included)
|
|
PERIOD PROVIDED FOR CONSTRUCTION: 30 months. |
CLIENT: SPANISH MINISTRY OF PUBLIC WORKS. Railroads Administration. |