FACTS OF INTEREST:
YEAR: 2010
|
|
SPECIFICATIONS:
|
|
LENGHT: |
6,58 kms
|
KIND OF WORK: |
Double track of UIC wide High-Speed Rail Roadway
|
TUNNELS: |
1 cut and cover tunnel 189,944 m long. Structure of type vault of reinforced concrete rested on brake shoes and counter vault .
|
STRUCTURES: |
4 Underpasses and 3 Overpasses.
2 Viaducts :
« Pizarros viaduct »: 782 m long, 17 spans, 48 m maximum span and 10.948,0 m² area.
« Valdetravieso viaduct »: 1.614 m long, 34 spans, 48 m maximum span and 22.596,0 m² area.
|
CONTRACT BUDGET: 788.848,71 € (VAT included)
| |
ESTIMATED BUDGET TO INVITED TENDERS OF THE WORKS: 77.575.237,20 € (VAT included)
|
|
PERIOD PROVIDED FOR CONSTRUCTION: 24 months. |
CLIENT: SPANISH MINISTRY OF PUBLIC WORKS. Railroads Administration. |