« El Romeral » tunel
FACTS OF INTEREST:
AÑO: 2007
|
|
SPECIFICATIONS:
|
|
LENTH: |
10,15 kilometers
|
KIND OF WORK: |
Divided highway with median 3,00 m width, totally paved, and dual 3 lanes driveway (total width of each driveway is 12,00 m).
Project velocity:100 km/h
|
INTERCHANGE: 1 |
«Castell de Ferro interchange»: Diamond type with 2 roundabouts.
|
TUNELS: 1 |
«El Romeraltunel»: Twintube of 12,00 m each tube. 406 m (right tube) and 382 m (left tube)
|
STRUCTURES: |
4 Viaducts with two decks each of 230, 255, 305 y 456 m length y 11,70 m width and 5.198, 5.763, 6.893 y 10.305 m2 total area each.
1 Underpasses
5 Overpasses
|
BUDGET OF PROJECT: 1.791.427,14 € (INCLUDED TAXES). |
|
BUDGET ESTIMATED TO INVITED TENDERS OF THE WORKS: 101.989.650,52 € (TAXES INCLUDES).PERIOD PROVIDED FOR PERFORMANCE OF WORK: 36 months. |
CLIENT: Spanish Ministry of Public Works. General Management of Road |