FACTS OF INTEREST:
YEAR: 2006
|
|
TECHNICAL FEATURES:
|
|
LENGTH: |
18,20 km.
|
KIND OF WORK: |
Motorway with 10,00 m wide median dual two lanes driveway (total width of each driveway is 10,50 m).
|
INTERCHANGES: 3 |
« A-4 connection interchange »: Consisting of two branches, Córdoba Center – Málaga branch of 1.160 m long and Málaga – Córdoba Center branch of 830 m long. 3 lanes each branch of 3,50 m wide each, outside shoulder of 2,50 m and inside shoulder of 1,00 m.
« CP-256 road connection interchange »: Diamond type.
« N-331 road connection interchange »: Type of roundabout below the confluence of the four branches from the trunk of the highway and two connections to the N-331.
|
STRUCTURES: |
5 Viaducts
10 Underpasses
4 Overpasses
|
CONTRACT BUDGET: 1.347.798,55 € (VAT included)
|
|
CONSTRUCTION BUDGET: 66.555.405,00 € € (VAT included)
|
|
PERIOD PROVIDED FOR WORK PERFORMANCE: 38 months |
CLIENT: Spanish Ministry of Public Works. General Management of Roads. |