Divided highway A-92 (Overpasses for an agricultural path)
FACTS OF INTEREST:
YEAR: 2001
|
|
TECHNICAL FEATURES:
|
|
LENGTH: |
8,83 kms.
|
KIND OF WORK: |
Divided highway with 10,00 m wide median and dual 2 lanes driveways (total width of each driveway is 12,00 m).
Speed design:120 km/h
|
INTERCHANGE: 1 |
«Montilla interchange»: Trumpet type with 1 roundabout for the connection with the highway N-331.
|
STRUCTURES: |
1 Bridge over «Bramble stream»: 95 m long with two decks of 14,8 m wide each, 3 spans, 31,9 m maximum span, 2.812,0 m2 area.
5 Overpasses
5 Underpasses.
|
CONTRACT BUDGET: 626.763,05 € (VAT included)
|
|
ESTIMATED BUDGET TO INVITED TENDERS OF THE WORKS: 32.851.798,28 € (VAT included)
|
|
PERIOD PROVIDED FOR CONSTRUCTION: 30 months. |
CLIENT: Spanish Ministry of Public Works. General Management of Roads. |