FACT OF INTEREST
INITIAL OBSERVATION: The Project, initially one (Section: Maçanet - Riudellots), was subsequently divided into two subsections, called: MAÇANET - SILS and SILS - RIUDELLOTS.
YEAR: 2003
|
|
SPECIFICATIONS:
|
|
LENGTH: |
7,27 kms.
|
KIND OF WORK: |
Double track of UIC wide High-Speed Rail Roadway
(Roadway total wide, 14,00 m).
Maximum speed: 350 km/h
Traffic type: Passengers.
|
1 P.A.E.T.: |
Overtaking and parking of trains post (Sidetrack Girona – Airport) with four tracks and platforms, 2.132,85 m long (section wide variable between 26,7 and 31,7 m).
|
STRUCTURES: |
2 Underpasses and 3 Overpasses.
3 Viaducts:
« Riera de Vallcanera viaduct»: 38 m long, 1 span and 532,0 m² area
« Riera de Bagastrá viaduct»: 108 m long, 4 spans, 30 m maximum span and 1.512,0 m² area.
« Riera de l´Onyar viaduct»: 57 m long, 3 spans, 25 m maximum span and 798,0 m² area.
|
CONTRACT BUDGET (Includes both subsections): 1.139.173,30 € (VAT included) |
|
ESTIMATED BUDGET TO INVITE TENDERS OF THE WORKS: 30.248.630,25 € (VAT included) |
|
PERIOD PROVIDED FOR CONSTRUCTION: 20 meses. |
CLIENT: SPANISH MINISTRY OF PUBLIC WORKS. Railroads Administration. |