benameji

 

FACT OF INTEREST

INITIAL OBSERVATION: The Project, initially one (Section: Maçanet - Riudellots), was subsequently divided into two subsections, called: MAÇANET - SILS and SILS - RIUDELLOTS.

YEAR: 2003

 

SPECIFICATIONS:

 

LENGTH:

7,27 kms.

 

KIND OF WORK:

Double track of UIC wide High-Speed Rail Roadway

 

(Roadway total wide, 14,00 m).

 

Maximum speed: 350 km/h

 

Traffic type: Passengers.

 

1 P.A.E.T.:

Overtaking and parking of trains post (Sidetrack Girona – Airport) with four tracks and platforms, 2.132,85 m long

(section wide variable between 26,7 and 31,7 m).

 

STRUCTURES: 

2 Underpasses and 3 Overpasses.

 

3 Viaducts:

 

« Riera de Vallcanera viaduct»: 38 m long, 1 span and 532,0 m² area

 

« Riera de Bagastrá viaduct»: 108 m long, 4 spans, 30 m maximum span and 1.512,0 m² area.

 

« Riera de l´Onyar viaduct»: 57 m long, 3 spans, 25 m maximum span and 798,0 m² area.

 

CONTRACT BUDGET (Includes both subsections): 1.139.173,30 € (VAT included)

 

ESTIMATED BUDGET TO INVITE TENDERS OF THE WORKS: 30.248.630,25 € (VAT included)

 

PERIOD PROVIDED FOR CONSTRUCTION: 20 meses.


CLIENT: SPANISH MINISTRY OF PUBLIC WORKS. Railroads Administration.