Viaduct over the Perral river (189 m length)
FACTS OF INTEREST:
YEAR: 2012 (In Edition)
|
|
SPECIFICATIONS:
|
|
LENGTH: |
13,15 kilómetros |
KIND OF WORK: |
Divided highway: dual 2 lanes (total width of each driveway 11,60 m).
Project velocity: 120 km/h
|
INTERCHANGE: 3 |
«Baélls interchange»: Diamond type with 2 roundabouts
« Estopiñán interchange»: Diamond type with 2 roundabouts
« Enlace de Purroy interchange »: Diamond type with 2 roundabouts. |
STRUCTURES: |
1 Viaduct over the « Obagas ravine» with just one deck for the two driveways, 332 m length, 6 veins, 72 m maximum light, 25,0 m width, area 8.300,0 m2.
|
BUDGET OF PROJECT: 1.771.053,20 € (TAXES INCLUDED)
|
|
BUDGET ESTIMATED TO INVITED TENDERS OF THE WORKS: 65.000.000,00 € (TAXES INCLUDED) |
CLIENT: Spanish Ministry of Public Works. General Management of Roads. |