| Riaño dams Operational Standards, Porma, Barrios de Luna, Villameca, Linares del Arroyo and San José.
|
Year: 1996
Client: SPANISH MINISTRY OF PUBLIC WORKS. Hydraulic works Administration.
|
| Automatic Hydrological Information System Management (S.A.I.H.) implementation in Júcar Basin.
|
Year: 1993 – 1996
Client: Júcar Hydrographic Confederation
|
| Guadalete Hydrological Plan Proposal – Barbate.
|
Year: 1995
Client: Guadalquivir Hydrographic Confederation
|
| Feasibility Study of certain exploitations to be considered in North and Douro Basins Hydrological Plan.
|
Year: 1995
Client: SPANISH MINISTRY OF PUBLIC WORKS. Hydraulic works Administration.
|
| Feasibility Study to increase regulation in the Tagus Basin (multiple provinces).
|
Year: 1995
Client: SPANISH MINISTRY OF PUBLIC WORKS. Hydraulic works Administration.
|
| Guadalquivir Hydrological Plan Proposal (Seville).
|
Year: 1994
Client: Guadalquivir Hydrographic Confederation
|
| Eastern Pyrenees Hydrological basin Project Implementation S.A.I.H.
|
Year: 1994
Client: SPANISH MINISTRY OF PUBLIC WORKS. Hydraulic works Administration.
|
| Automatic Hydrological Information System Management (S.A.I.H.) implementation in Júcar Hydrological Basin.
|
Year: 1994
Client: Júcar Hydrographic Confederation
|
| Support Studies for the National Hydrological Plan design.
|
Year: 1993
Client: SPANISH MINISTRY OF PUBLIC WORKS. Hydraulic works Administration.
|
| Implementation of FONIA network in the eastern Pyrenees.
|
Year: 1993
Client: SPANISH MINISTRY OF PUBLIC WORKS. Hydraulic works Administration.
|
| Automatic Hydrological Information System Management (S.A.I.H.) implementation in Júcar Hydrological Basin.
|
Year: 1991 - 1993
Client: Júcar Hydrographic Confederation
|
| Study of S.A.I.H. data use in Júcar Basin.
|
Year: 1993
Client: Júcar Hydrographic Confederation
|
| Pozo de Ramos dam detailed design (Guadalajara).
|
Year: 1992
Client: Canal de Isabel II
|
| Preparation of Hydraulic Works General Technical Specification.
|
Year: 1992
Client: SPANISH MINISTRY OF PUBLIC WORKS. Hydraulic works Administration.
|
| Drafting of the Riaño Dams Operational Standard, Porma, Barrios de Luna, Villameca, Linares del Arroyo and San José.
|
Year: 1992
Client: Douro Hydrographic Confederation
|
| Study of Tagus Hydrographic Basin Resource Operating Systems.
|
Year: 1992
Client: Tagus Hydrographic Confederation
|
| Construction control of Segura river Channeling. Section: Contraparada-Murcia.
|
Year: 1992
Client: Segura Hydrographic Confederation
|
| Construction control of Campotéjar water treatment plant Enlargement (Molina del Segura, Murcia).
|
Year: 1992
Client: Taibilla Channels Commonwealth.
|
| Construction control of Enlargement of the production capacity of Manises and Picassent water treatment plants (Valencia).
|
Year: 1992
Client: Valencia city Council
|
| Flows Supplement Draft at Camp of Morvedre. Turia - Sagunto Water supply (Valencia).
|
Year: 1992
Client: Construction company
|
| Study of Ebro Basin hydraulic resources (Collaboration).
|
Year: 1992
Client: Ebro Hydrographic Confederation
|
| Detailed design: Rambla del Boquerón Dam (Hellín, Albacete).
|
Year: 1992
Client: Segura Hydrographic Confederation
|
| Detailed design: Rambla de los Charcos Dam (Albacete).
|
Year: 1991
Client: Segura Hydrographic Confederation
|