benameji

 

FACT OF INTEREST

YEAR: 2004

 

SPECIFICATIONS:

 

LENGTH:

7,78 kms.

 

KIND OF WORK:

Double track of UIC wide High-Speed Rail Roadway

 

(Roadway total wide, 14,00 m).

 

Maximum speed: 250 km/h.

 

Traffic type: Mixed (Passengers and goods).

 

TUNNELS: 2

« Aduna tunnel »: 4.540,778 m long; Free cross-sectional tunnel area 85 m²

 

« Andoain tunnel »: 1.706,584 m long; Free cross-sectional tunnel area 85 m²

 

STRUCTURES: 

3 Viaducts:

 

« Antzibar river viaduct »: 198 m long, 4 spans, 55 m maximum span and 2.772,0 m² area

 

« Oria river viaduct »: 175 m long, 3 spans, 78 m maximum span and 2.450,0 m² area.

 

« GI-131 highway viaduct »: 220 m long, 5 spans, 50 m maximum span and 3.080,0 m² area

 

CONTRACT BUDGET: 408.000,00 € (VAT included)

 

ESTIMATED BUDGET TO INVITE TENDERS OF THE WORKS: 112.725.946,68 € (VAT included)

 

PERIOD PROVIDED FOR CONSTRUCTION: 30 months.


CLIENT: SPANISH MINISTRY OF PUBLIC WORKS. Railroads Administration.