FACT OF INTEREST
YEAR: 2004
|
|
SPECIFICATIONS:
|
|
LENGTH: |
7,78 kms.
|
KIND OF WORK: |
Double track of UIC wide High-Speed Rail Roadway
(Roadway total wide, 14,00 m).
Maximum speed: 250 km/h.
Traffic type: Mixed (Passengers and goods).
|
TUNNELS: 2 |
« Aduna tunnel »: 4.540,778 m long; Free cross-sectional tunnel area 85 m²
« Andoain tunnel »: 1.706,584 m long; Free cross-sectional tunnel area 85 m²
|
STRUCTURES: |
3 Viaducts:
« Antzibar river viaduct »: 198 m long, 4 spans, 55 m maximum span and 2.772,0 m² area
« Oria river viaduct »: 175 m long, 3 spans, 78 m maximum span and 2.450,0 m² area.
« GI-131 highway viaduct »: 220 m long, 5 spans, 50 m maximum span and 3.080,0 m² area
|
CONTRACT BUDGET: 408.000,00 € (VAT included)
|
|
ESTIMATED BUDGET TO INVITE TENDERS OF THE WORKS: 112.725.946,68 € (VAT included)
|
|
PERIOD PROVIDED FOR CONSTRUCTION: 30 months. |