benameji

« El Romeral » tunel


FACTS OF INTEREST:

AÑO: 2007

 

SPECIFICATIONS:

 

LENTH:

10,15 kilometers

 

KIND OF WORK:

Divided highway with median 3,00 m width, totally paved, and dual 3 lanes driveway (total width of each

driveway is 12,00 m).

 

Project velocity:100 km/h

 

INTERCHANGE: 1

«Castell de Ferro interchange»: Diamond type with 2 roundabouts.

 

 

TUNELS: 1

«El Romeraltunel»: Twintube of 12,00 m each tube.

406 m (right tube) and 382 m (left tube)

 

STRUCTURES:

4 Viaducts with two decks each of 230, 255, 305 y 456 m length y 11,70 m width and 5.198, 5.763, 6.893 y 10.305 m2 total area each.

 

1 Underpasses

 

5 Overpasses

 

BUDGET OF PROJECT: 1.791.427,14 € (INCLUDED TAXES).

BUDGET ESTIMATED TO INVITED TENDERS OF THE WORKS: 101.989.650,52 € (TAXES INCLUDES).

PERIOD PROVIDED FOR PERFORMANCE OF WORK: 36 months.


CLIENT: Spanish Ministry of Public Works. General Management of Road