benameji

Divided highway A-92 (Overpasses for an agricultural path)


FACTS OF INTEREST:

YEAR: 2001

 

TECHNICAL FEATURES:

 

LENGTH:

8,83 kms.

 

KIND OF WORK:

Divided highway with 10,00 m wide median and dual 2 lanes driveways (total width of each driveway is 12,00 m).

 

Speed design:120 km/h

 

INTERCHANGE: 1

«Montilla interchange»: Trumpet type with 1 roundabout for the connection with the highway N-331.

 

STRUCTURES:  

1 Bridge over «Bramble stream»: 95 m long with two decks of 14,8 m wide each, 3 spans, 31,9 m maximum span, 2.812,0 m2 area.

 

5 Overpasses

 

5 Underpasses.

 

CONTRACT BUDGET: 626.763,05 € (VAT included)

 

ESTIMATED BUDGET TO INVITED TENDERS OF THE WORKS: 32.851.798,28 € (VAT included)

 

PERIOD PROVIDED FOR CONSTRUCTION: 30 months.


CLIENT: Spanish Ministry of Public Works. General Management of Roads.