TECHNICAL CHARACTERISTICS OF THE AUDITED SUBSECTION: | |
LENGTH: | 7.50 kilometers. |
WORK CLASS: | Platform of High Speed Line of double track of UIC gauge. Maximum speed : 350 km/h Type of traffic : Passengers. |
TUNNELS: 1 | 1,750 m long “Figueres Tunnel”. Excavation carried out by the advance-cutting method. 1 intermediate cut-and-cover tunnel 85 m long |
STRUCTURES: | 3 Lower Steps 4 Viaducts: “Viaduct over the access to Figueres Sur”: Length 55 m, 3 spans, maximum span 25 m and surface area 770 m². “Aragall Viaduct”: Length 533 m, 14 spans, maximum span 45 m and surface area 7,462 m². “Viaduct over the Manol River: Length 130 m, 3 spans, maximum span 60 m and surface area 1,820 m². “Viaduct over Riera de Figueres ” : Length 30 m, 1 span, span of 35 m and surface of 1.782 m². |
TIME FOR EXECUTION OF THE WORKS: 31 months.