Control and supervision of works: Cordoba Highway A-92, N-331 from Cordoba to Malaga. Section: Córdoba – Fernán Núñez. Code: 12-CO-3840

Date: 2006
CONTRACT BUDGET: 1.347.798,55 € (V.A.T. included)
BUDGET FOR THE WORKS: 66.555.405,00 € (V.A.T. included)
CLIENT: Ministry of Public Works. General Directorate of Roads.

TECHNICAL CHARACTERISTICS:

LENGTH:18.20 kilometers.
WORK CLASS:Highway with a 10.00 m wide median and two 2-lane carriageways (total width of each carriageway 10.50 m).
LINKS: 3“Connection junction with the A-4: Consisting of two branches, the Córdoba Centro – Málaga branch, 1,160 m long, and the Málaga – Córdoba Centro branch, 830 m long. With 3 lanes each branch of 3.50 m wide each, 2.50 m outside shoulders and 1.00 m inside shoulders.
“Connection junction with the CP-256 road”: Diamond type.
“Connection junction with the N-331 road”: Typology of lower traffic circle where the four branches coming from the trunk of the highway and the two connections with the N-331 road converge.
STRUCTURES: 5 Viaducts
10 Lower Steps
4 Superior Steps

ESTIMATED TIME FOR EXECUTION OF THE WORKS: 38 months