Control and Surveillance of the Platform Works of the High Speed Line Madrid – Zaragoza – Barcelona – French Border. Section: Maçanet – Riudellots. Subsection: Maçanet – Sils. File: PC 008/01

Date: 2009
CONTRACT BUDGET: 1.849.025,49 € (V.A.T. included)
BUDGET FOR THE WORKS: 42.450.366,69 € (V.A.T. included)
Client: Gestor de Infraestructuras Ferroviarias (G.I.F.) Currently Administrador de Infraestructuras Ferroviarias (ADIF).

TECHNICAL CHARACTERISTICS:

LENGTH:5.66 kilometers.
WORK CLASS:UIC gauge double track high speed line platform
(Total platform width, 14.00 m).
Maximum speed : 350 Km/h
Type of traffic : Passengers.
TUNNELS:1 False tunnel “Ecoducto P.K. 704+950” of 37.80 m length formed by a vault of inner section of
13.72 x 8.96 m (W x H). 10.08 m long flute spikes.
STRUCTURES: 2 Underpasses and 3 Overpasses.
2 Viaducts:
“J.A.F.V. Viaduct”: Length 691 m, 14 spans, maximum span 55 m and surface area 9,674.0 m².
“Viaduct Riu d’Esplet ” : Length 99 m, 3 spans, maximum span 41 m and surface 1.386,0 m².

ESTIMATED TIME FOR EXECUTION OF WORKS: 58 months