TECHNICAL CHARACTERISTICS:
LENGTH: | 1.60 kilometers. |
WORK CLASS: | Duplication of existing roadway with occupation of a 33 m wide coastal strip. Urban access road to the town of La Línea de La Concepción and access to the Rock of Gibraltar. |
LINKS: 1 | 5 Urban traffic circles. |
STRUCTURES: | 1 “Puente del Príncipe” : Expansion of the existing deck. |
SCOLLERA | Placement of trapezoidal riprap for sea defense, consisting of an inner layer with 75 kg and 0.75 m thick and an outer layer of riprap with a minimum weight of 1,500 kg and a 2.00 m thick edge. The section is completed with the placement of a geotextile sheet between the second layer and the backfill. |
ESTIMATED TIME FOR EXECUTION OF THE WORKS: 19 months