Cornellá del Terri – Vilademuls subsection.

Date: 2011
CONTRACT BUDGET: 2.593.788,83 € (V.A.T. included)
BUDGET FOR THE WORKS WITH AMENDMENTS: 204.781.909,42 € (V.A.T. included)
CLIENT: Administrator of Railway Infrastructures (A.D.I.F.)
TECHNICAL CHARACTERISTICS OF THE AUDITED SUBSECTION:
LENGTH:7.10 kilometers.
WORK CLASS:Platform of High Speed Line of double track of UIC gauge. Maximum speed : 350 km/h Type of traffic : Travellers
TUNNELS: 2“Llogaia Tunnel” 1,723 m long. Excavation carried out by the advance-cutting method. “Feixes d’en Vidal Tunnel” 1,182 m long. Excavation carried out by the advance-cutting method. 4 cut-and-cover tunnels, 47, 50, 317 and 60 m long.
STRUCTURES:1 Underpass and 1 Overpass. 2 Viaducts: “New Terri Viaduct”: Length 680 m, 16 spans, maximum span 45 m and surface area 9,520 m². “Viaduct over the Riera de Farga ” : Length 335 m, 8 spans, maximum span 45 m and surface area 4,690 m².

TIME FOR EXECUTION OF THE WORKS: 48 months.