TECHNICAL CHARACTERISTICS OF THE AUDITED SUBSECTION: | |
LENGTH: | 7.10 kilometers. |
WORK CLASS: | Platform of High Speed Line of double track of UIC gauge. Maximum speed : 350 km/h Type of traffic : Travellers |
TUNNELS: 2 | “Llogaia Tunnel” 1,723 m long. Excavation carried out by the advance-cutting method. “Feixes d’en Vidal Tunnel” 1,182 m long. Excavation carried out by the advance-cutting method. 4 cut-and-cover tunnels, 47, 50, 317 and 60 m long. |
STRUCTURES: | 1 Underpass and 1 Overpass. 2 Viaducts: “New Terri Viaduct”: Length 680 m, 16 spans, maximum span 45 m and surface area 9,520 m². “Viaduct over the Riera de Farga ” : Length 335 m, 8 spans, maximum span 45 m and surface area 4,690 m². |
TIME FOR EXECUTION OF THE WORKS: 48 months.