Pontos – Borrassà subsection.

Date: 2011
CONTRACT BUDGET: 2.593.788,83 € (V.A.T. included)
BUDGET FOR THE WORKS: 40.887.114,13 € (V.A.T. included)
CLIENT: Administrator of Railway Infrastructures (A.D.I.F.)
LENGTH:7.20 kilometers.
WORK CLASS:Platform of High Speed Line of double track of UIC gauge.
Maximum speed : 350 km/h
Type of traffic : Passengers.
STRUCTURES: 5 Lower Steps
1 Overpass
6 Viaducts:
“Viaduct over Can Fares” : Length 100 m, 3 spans, maximum span 45 m and surface area 1,400 m².
“Viaduct over the Riera de Santa Ana”: Length 220 m, 5 spans, maximum span 60 m and surface area 3,080 m².
“Viaduct over Plà de Caboters”: Length 442 m, 10 spans, maximum span 47 m and surface area 6,188 m².
“Viaduct over the A-2 highway” : Length 60 m, 2 spans, maximum span 30 m and surface area 840 m².
“Viaduct over the AP-7”. : Length 130 m, 4 spans, maximum span 36 m and surface area 1,820 m².
“Viaduct over Font Vella : Length 45 m, 1 span, maximum span 45 m and surface 630 m².

TIME FOR EXECUTION OF THE WORKS: 31 months.