Sant Juliá de Remis – Cornellà del Terri subsection.

Date: 2011
CONTRACT BUDGET: 2.593.788,83 € (V.A.T. included)
BUDGET FOR THE WORKS WITH AMENDMENTS: 101.211.613,98 € (V.A.T. included)
CLIENT: Administrator of Railway Infrastructures (A.D.I.F.)
TECHNICAL CHARACTERISTICS OF THE AUDITED SUBSECTION:
LENGTH:3.30 kilometers.
WORK CLASS:Platform of High Speed Line of double track of UIC gauge. Maximum speed : 350 km/h Type of traffic : Travellers
TUNNELS: 2“La Garriga Tunnel ” 758 m long. Excavation carried out by the advance-cutting method. “Tunnel of Sant Andreu ” of 649 m in length. Excavation carried out by the advance-cutting method. 4 false tunnels, 36.48, 41.52, 40.77 and 43.07 m long.
STRUCTURES:3 Viaducts: “Viaduct over the C-66 highway”: Length 287 m, 6 spans, maximum span 65 m and surface area 4,018 m². “Viaduct Torrent de Riudellots ” : Length 164 m, 5 spans, maximum span 37 m and surface area 3.296 m². “Viaduct Torrent de Marmanyà ” : Length 127 m, 4 spans, maximum span 37 m and surface 1.778 m².

TIME FOR EXECUTION OF THE WORKS: 50 months.