LENGTH: | 8.00 kilometers. |
WORK CLASS: | Platform of High Speed Line of double track of UIC gauge. Maximum speed : 350 km/h Type of traffic : Travellers |
STRUCTURES: | 3 Lower Steps and 5 Upper Steps. 4 Viaducts: “Viaduct over the N-156 road”: Length 100 m, 3 spans, maximum span 40 m and surface area 1,400 m². “Riudellots Viaduct (over the AP-7)”: Length 106 m, 2 spans, maximum span 53 m and surface area 1,674 m². “Viaduct over the N-II AP-7 connection): Length 140 m, 4 spans, maximum span 40 m and surface area 1,960 m². “Viaduct over the Rec Can Gibert: Length 340 m, 9 spans, maximum span 40 m and surface area 4,760 m². |
TIME FOR EXECUTION OF THE WORKS: 39 months.