TECHNICAL CHARACTERISTICS OF THE AUDITED SUBSECTION: | |
LENGTH: | 0.60 kilometers. |
WORK CLASS: | Platform of High Speed Line of double track of UIC gauge. Maximum speed : 350 km/h Type of traffic : Travellers |
TUNNELS: 1 | Tunnel executed between screens, 566 m long. |
TIME FOR EXECUTION OF THE WORKS: 26 months.