Vilademuls – Pontos subsection.

Date: 2011
CONTRACT BUDGET: 2.593.788,83 € (V.A.T. included)
BUDGET FOR THE WORKS WITH AMENDMENT: 187.000.248,69 € (V.A.T. included)
CLIENT: Administrator of Railway Infrastructures (A.D.I.F.)
TECHNICAL CHARACTERISTICS OF THE AUDITED SUBSECTION:
LENGTH:5.70 kilometers.
WORK CLASS:Platform of High Speed Line of double track of UIC gauge. Maximum speed : 350 km/h Type of traffic : Passengers.
TUNNELS: 1“Les Cavorques Tunnel”, 2,539 m long. Excavation carried out by the advance-cutting method. 2 cut-and-cover tunnels, 152.52 and 60.72 m long.
STRUCTURES: 1 Underpass
4 Viaducts: “Viaduct over the Cinyana stream”: Length 96 m, 5 spans, maximum span 22 m and surface area 1,344 m².
“Viaduct over Rec Casinyola 1 : Length 77 m, 3 spans, maximum span 37 m and surface 1,078 m².
“Viaduct over Rec Casinyola 2 : Length 127 m, 4 spans, maximum span 37 m and surface area 1,778 m².
“Viaduct over the Fluvià River: Length 835 m, 14 spans, maximum span 70 m and surface area 11,690 m².

TIME FOR EXECUTION OF THE WORKS: 47 months.