WORK CLASS: | Alt Empordà railway station in the town of Vilafant for High Speed Line. The work includes the following actions: – Passenger building with a surface area of 1232 m² developed on a single floor. – 6,973 m² of parking area for 144 parking spaces. – Two platforms of 662.470 x 10 m and 663.750 x 10 m. – Access roads with a total area of 13,627 m². |
TIME FOR EXECUTION OF THE WORKS: 11 months.